Brookfield's Holtwood and Safe Harbor hydroelectric dams on the lower Susquehanna, about 670 megawatts together, are the first plants under a Google deal for up to 3,000 megawatts of hydropower, and both are being relicensed by FERC.

Active / ApprovedHydropower PPABrownfieldS Central
At a glance

The project by the numbers

StatusOperational
Capacity670 MW
First announced2025-07-15
Target onlineOperational

Two Susquehanna River dams now sell their power to Google for 20 years

The number that mattersThe Holtwood and Safe Harbor contracts are worth more than $3 billion, the first deals under what Brookfield calls the world's largest corporate framework agreement for hydroelectricity.
Developer
Brookfield Renewable owns both dams. Holtwood's FERC licensee is BIF III Holtwood LLC, and Safe Harbor's is Safe Harbor Water Power Corporation. Brookfield took over Safe Harbor in 2014 and bought Holtwood from Talen Energy in 2015, according to Renewable Energy World.
Tenant
Google buys the power under two 20-year power purchase agreements signed July 15, 2025, to support its operations across the PJM grid region. There's no data center at either dam. Brookfield says the deal lets it keep existing commitments, including Amtrak's supply from Safe Harbor.
Current stage
Both dams are operating and the contracts are signed. Both are partway through FERC relicensing: FERC issued study plan determinations on February 10, 2026, and Brookfield filed study progress reports on August 14, 2026.
Decision body
The Federal Energy Regulatory Commission decides the new licenses. Pennsylvania DEP, the Pennsylvania Fish and Boat Commission, the Susquehanna River Basin Commission, Maryland's Department of the Environment and federal wildlife agencies take part in the relicensing. The power contracts themselves didn't need local zoning approval.
Top issues
Whether data center companies should lock up output from existing plants instead of adding new supply to a tight PJM grid, fish passage and river flows during relicensing, recreation and whitewater access below the dams, and dam safety.
Key opponents
No organized opposition to the Google contracts has been reported. In the FERC relicensing, the Lower Susquehanna Riverkeeper Association, American Whitewater, and the Lancaster County Conservancy with the Farm and Natural Lands Trust of York County and the Susquehanna National Heritage Area have filed comments and study requests.
Key supporters
Google and Brookfield. Google's head of data center energy, Amanda Peterson Corio, called hydropower 'a proven, low-cost technology,' and Brookfield Asset Management President Connor Teskey said power from many sources will be needed to meet demand from artificial intelligence.

How we got here

Holtwood, the oldest of the three big lower Susquehanna dams, was built from 1905 to 1910 and gained a second powerhouse adding 125 megawatts in 2013; it's rated at about 252 megawatts. Safe Harbor was built in 1930, began operating in 1931 and is rated at 417.5 megawatts. Both current FERC licenses were issued August 14, 1980. FERC gave advance notice of Holtwood's August 31, 2030 expiration on August 30, 2024, and Brookfield filed Holtwood's notice of intent on April 2, 2025. Public scoping meetings were held June 25, 2025. On July 15, 2025, Brookfield and Google announced a Hydro Framework Agreement for up to 3,000 megawatts, with 20-year contracts for Holtwood and Safe Harbor as the first deals. Proposed study plans were filed September 11, 2025, FERC issued study plan determinations February 10, 2026, and study progress reports were filed August 14, 2026.

What is at stake

Impacts raised and open questions

Energy costs and the grid

Medium

The contracts dedicate output from two existing plants to Google. Utility Dive noted that PJM's supply is tight partly because of data centers, and that PJM's market monitor, Joseph Bowring, has urged FERC to require data centers to bring new generation rather than rely on existing resources.

Utility Dive

Water

Medium

Fish passage was suspended at both dams for the 2026 season, according to Brookfield's January 6, 2026 filings, and river flows, fish passage and recreation are being studied in relicensing, with state and federal agencies and the Lower Susquehanna Riverkeeper Association filing comments on the study plans.

Federal Energy Regulatory Commission eLibrary

Public safety

Low

Brookfield reported to FERC leakage observed starting February 18, 2026 near Unit 7 at Holtwood's legacy powerhouse, and FERC's dam safety staff review annual surveillance reports for both dams.

Federal Energy Regulatory Commission eLibrary
Community response

Who is organizing against it

Lower Susquehanna Riverkeeper Association

Lower Susquehanna River watershed (based in Wrightsville)

Tactics: Filed comments with FERC on Holtwood's pre-application document (July 31, 2025), proposed study plan (December 15, 2025) and revised study plan (January 27, 2026).

Takes part in relicensing as a watchdog; it hasn't been reported as opposing the Google contracts.

Website · Facebook · Donate

Timeline

How it has unfolded

Legal record

Filings and legal actions

  • 2025-04-02
    FERC relicensing (Integrated Licensing Process) Federal Energy Regulatory Commission · P-1881-122

    Relicensing of the Holtwood Hydroelectric Project, whose current license expires August 31, 2030.

    BIF III Holtwood LLC (Brookfield Renewable); state and federal agencies; Lower Susquehanna Riverkeeper Association; American Whitewater; others · Studies under way; study progress report filed August 14, 2026
  • 2025-09-11
    FERC relicensing (Integrated Licensing Process) Federal Energy Regulatory Commission · P-1025-091

    Relicensing of the Safe Harbor Hydroelectric Project, whose current license expires April 22, 2030. The filed date shown is the proposed study plan filing.

    Safe Harbor Water Power Corporation (Brookfield Renewable); state and federal agencies; others · Studies under way; study plan determination issued February 10, 2026
News

Coverage of this project

Sources

Know your rights

In Pennsylvania, the local zoning ordinance sets the route. A conditional use is decided by the elected governing body (supervisors, commissioners or council). A special exception or variance, and an appeal of a zoning officer’s decision, go to the Zoning Hearing Board. Each is a public hearing on a record: affected neighbors can ask for party status, cross-examine witnesses, and appeal. Municipalities can also adopt data center ordinances with enforceable standards.

Know your rights →

Take action

Organized community opposition is the single most effective check on these projects in Pennsylvania. Show up to hearings, submit comment when it is taken, support legal and expert-witness costs, and press your municipality for a real ordinance. Pennsylvania municipalities cannot simply freeze applications, but a curative amendment under the Planning Code gives them a defined window to fix a defective ordinance.

How communities push back →