Cheswick Generating Station Data Center

Springdale Borough, Allegheny County

Dynamo DC, legally Allegheny DC Property Co. LLC, wants to turn 47 acres of the former Cheswick coal plant site in Springdale Borough into a data center campus with up to 180 megawatts of computing load, a data hall of about 565,000 square feet and a 200,000 square foot cooling and utility building.

Active / ApprovedLargeGrid HyperscaleBrownfieldSW
At a glance

The project by the numbers

StatusApproved
Capacity240 MW
Building area652,300 sq ft
Site47.2 acres
Permanent jobs, as claimed100
First announced2025-08
Target online2028 to 2027

Springdale data center has borough approval and now faces Allegheny County land development review

The number that mattersBecause Springdale is one of about two dozen Allegheny County municipalities without its own land development ordinance, the final say on the 47-acre campus site plan rests with Allegheny County planners.
Developer
Allegheny DC Property Co. LLC, which now goes by Dynamo DC and has been reported as an affiliate of the investment firm Davidson Kempner Capital Management. Brian Regli is the company's consultant and main spokesman, Anna Skipper Jewart of Babst Calland is its land use counsel, and Civil & Environmental Consultants is its engineering firm. The company bought the 47.2-acre site for $14.3 million on Nov. 19, 2025, from Cheswick Plant Environmental Redevelopment, an entity owned by Charah Environmental.
Tenant
No tenant has been named. The developer describes the campus as built for high-density computing and AI workloads and hasn't said who would use it.
Current stage
Springdale Borough Council granted conditional use approval on December 16, 2025, and the borough also granted six variances. Springdale has no subdivision and land development ordinance of its own, so Allegheny County Economic Development's Planning Division is reviewing the developer's 182-page preliminary land development plan, on which county staff made 97 comments. The county held a virtual public meeting on October 14, 2026, and its review found missing and inconsistent information, including no evidence of completed cleanup of arsenic and other contamination. The project website now lists a power draw of up to 240 megawatts, up from the 180 megawatts first proposed, according to WESA. The developer still needs an air quality permit from the Allegheny County Health Department, and the state's permit tracker shows it has water obstruction and encroachment permits but hasn't yet filed for erosion control or brownfield cleanup permits.
Decision body
Allegheny County Economic Development's Planning Division decides the preliminary and final land development plans. The Allegheny County Health Department issues the air quality permit, and the Pennsylvania Department of Environmental Protection handles erosion and stormwater permits and the Act 2 cleanup. Springdale Borough Council granted the conditional use, and a borough zoning officer issues zoning and building permits after the county's final approval.
Top issues
Noise from more than 100 backup diesel generators and cooling equipment, air pollution from those generators, contaminated soil left from the coal plant including arsenic and methylnaphthalene, well water and groundwater, a church cemetery that borders the site, electricity demand and power bills, property values, and how little say a small borough has over a project this size.
Key opponents
Save Allegheny Valley Environment (SAVE), a residents group that meets weekly in Springdale, and Indivisible Allegheny Valley are the main local opposition groups. SAVE treasurer Marty Garrigan says the group wants the county to deny the plan. Regional groups including Protect PT, the Breathe Project, the Environmental Health Project and the Pittsburgh and Southwestern Pennsylvania chapter of the Climate Reality Project have organized protests, a sign-on letter to county leaders and public education. Most residents who spoke at the borough hearings and at the county's Oct. 14, 2026 meeting opposed the project.
Key supporters
The Pittsburgh Regional Building Trades backs the project; business manager Jason Markovich told the county it would bring more than 1 million union work hours. Five of seven borough council members voted yes in December 2025, though several, including Councilor Dolly Stephens, said they did so mainly because they expected to lose a lawsuit if they said no. Then-borough manager Terry Carcella said council lacked legal grounds to reject the plan without evidence of harm.

How we got here

The 565 megawatt Cheswick Generating Station retired in 2022, the same year Charah Environmental's redevelopment arm bought the site. Allegheny DC Property Co. submitted its conditional use plans in August 2025. The borough planning commission put off its recommendation three times that fall while the borough hired Thornton Acoustics and Vibrations for an independent noise study, and the Zoning Hearing Board heard the developer's variance requests on Oct. 22, 2025, including a request to raise the height limit to 75 feet. The planning commission recommended approval with conditions on Nov. 17, 2025, and the land sale closed for $14.3 million on Nov. 19. On Nov. 24, council heard about five hours of developer testimony after the only formal objector withdrew, and a real estate appraiser testifying at the hearing estimated roughly $2.55 million a year in property taxes for the borough, school district and county combined. Council approved the conditional use 5 to 2 on Dec. 16, 2025. Borough manager Terry Carcella was hired as Ebensburg's borough manager in March 2026, and Patrick Bono now manages Springdale. Residents planned a protest for May 30, 2026, and on June 10 the developer held an open house showing generators moved from the roof to ground level inside double enclosures, a smaller building, solar panels in the parking lot and closed-loop cooling, while advocates delivered a sign-on letter asking the county to require an air permit first. Allegheny County's virtual public meeting on the preliminary land development plan drew about 80 people on Oct. 14, 2026.

What is at stake

Impacts raised and open questions

Noise and vibration

High

A developer acoustical engineer estimated the backup generators would be perceived at about 75 decibels at 23 feet, and Councilman Joe Kern asked whether all of the more than 100 diesel backup generators would run during an outage; the project architect said they usually would.

TribLive (Valley News Dispatch)

Public safety

High

The developer's plan shows parts of the site are contaminated with methylnaphthalene and arsenic, and the county's review said the application didn't indicate any completed remediation. The developer's engineers say an Act 2 cleanup is underway.

Pittsburgh's Public Source

Noise and vibration

Medium

The June 2026 redesign moved the diesel generators from the roof to ground level along the sides of the building, where the developer's consultant says they will be doubly enclosed within walls to cut sound.

90.5 WESA

Air quality

Medium

The developer's consultant confirmed the campus will run on grid power with diesel generators as backup. Its environmental consultant says those generators are the only on-site source of air pollution and that the company must show through modeling that it won't exceed EPA one-hour, 24-hour and annual limits before the Allegheny County Health Department will issue the permit it needs to build.

Pittsburgh's Public Source

Water

Medium

The company says it will use a closed cooling system with air-cooled chillers that run mainly on electricity. Neighbors who rely on well water worry about heavy metals reaching groundwater.

WPXI-TV

Water

Medium

Before the county's October 2026 meeting the company said the site would be capped and an environmental covenant would restrict groundwater use, while county consultants asked where contaminated soil will go once it's removed.

90.5 WESA

Environmental justice and site legacy

Medium

Advocates say Springdale, Cheswick and Harmar are environmental justice communities long burdened by pollution from the coal plant, and they asked the county Health Department, county Economic Development and DEP to provide the added public process those areas get for air permits.

Breathe Project (press release)

Energy costs and the grid

Medium

The Allegheny Front reported the project's 180 megawatts equals the demand of more than 150,000 homes, and residents raised concerns about strain on the electric system and recent power outages.

90.5 WESA / The Allegheny Front

Jobs and tax claims

Medium

The developer promises up to 1,000 temporary construction jobs and up to 100 permanent positions.

Axios Pittsburgh

Property values

Medium

Speakers at the county's Oct. 14, 2026 meeting cited falling property values, and one longtime resident said she couldn't get even a low offer after listing her home.

90.5 WESA

Visual and light

Medium

The developer asked to raise the height limit to 75 feet, where borough rules allow 45 feet or 60 feet with roof equipment, and to build an 8-foot perimeter fence where the limit is 7 feet.

TribLive (Valley News Dispatch)

Traffic

Low

The planning commission recommended moving site access away from a residential section of Duquesne Avenue.

Axios Pittsburgh
Community response

Who is organizing against it

Save Allegheny Valley Environment (SAVE)

Springdale Borough and nearby Allegheny Valley communities

Leaders: Marty Garrigan (treasurer)

Tactics: Educating residents on the county's land development process, protests, and pushing for the county to deny the plan

Public Source (Aug. 4, 2026) describes SAVE and Indivisible Allegheny Valley as the primary engines of opposition. Protect PT's Springdale page lists SAVE meetings on Wednesdays from 7 to 8:30 p.m. at From Italy Pizza, 1115 Lincoln Ave., Springdale.

Indivisible Allegheny Valley

Allegheny Valley

Tactics: Organizing residents on the data center and other local issues

Named by Public Source as one of two primary opposition groups.

Protect PT

Regional environmental nonprofit (Harrison City, Pa.)

Leaders: Lauren Posey (environmental policy advocate)

Tactics: Community meetings, project updates, an air pollution dispersion map and email alerts

Axios reported Protect PT held a community meeting a week before the planning commission vote in 2025 and warned the borough's ordinances had no data center provisions.

Website · Facebook

Breathe Project

Pittsburgh region clean air coalition

Leaders: Debra Smit (press contact)

Tactics: Press conference and protest before the June 10, 2026 open house, and a sign-on letter asking the county to require an air permit before land development review

Organized the June 10, 2026 rally outside the borough building, according to Public Source.

Website · Facebook

Environmental Health Project

Southwestern Pennsylvania public health nonprofit

Leaders: Talor Musil (field manager)

Tactics: Pushing for an investigation of local and regional health impacts, including generator emissions

Climate Reality Project, Pittsburgh and Southwestern Pennsylvania chapter

Regional

Leaders: Phoebe Reese (co-chair)

Tactics: Calling for a plan without diesel generators and for towns to pass data center ordinances early

Timeline

How it has unfolded

  • 2025-10-22The Zoning Hearing Board heard the developer's variance requests, including raising the height limit to 75 feet and allowing an 8-foot fence. TribLive (Valley News Dispatch)
  • 2025-10-27The planning commission put off its recommendation for a third time while an independent noise study was completed. TribLive (Valley News Dispatch)
  • 2025-11-17The planning commission recommended approval of the conditional use with conditions on noise and site access. TribLive (Valley News Dispatch)
  • 2025-11-19Allegheny DC Property Co. buys the 47.2-acre Cheswick site for $14.3 million Springdale Borough
  • 2025-11-24Council heard about five hours of developer testimony on acoustics, traffic and environmental impacts after the only formal objector withdrew. TribLive (Valley News Dispatch)
  • 2025-12-16Springdale Borough approves Cheswick conditional use 5-2 Springdale Borough
  • 2026-05-30A residents group scheduled a protest for this date at Pittsburgh Street and Lincoln Avenue to build opposition ahead of county land development hearings. TribLive (Valley News Dispatch)
  • 2026-06-10The developer held an open house showing revised designs while advocates held a press conference and delivered a sign-on letter to county leaders. Pittsburgh's Public Source
  • 2026-10-14The county held a virtual public meeting on the preliminary land development plan, drawing about 80 attendees. Pittsburgh's Public Source
News

Coverage of this project

Sources

Know your rights

In Pennsylvania, the local zoning ordinance sets the route. A conditional use is decided by the elected governing body (supervisors, commissioners or council). A special exception or variance, and an appeal of a zoning officer’s decision, go to the Zoning Hearing Board. Each is a public hearing on a record: affected neighbors can ask for party status, cross-examine witnesses, and appeal. Municipalities can also adopt data center ordinances with enforceable standards.

Know your rights →

Take action

Organized community opposition is the single most effective check on these projects in Pennsylvania. Show up to hearings, submit comment when it is taken, support legal and expert-witness costs, and press your municipality for a real ordinance. Pennsylvania municipalities cannot simply freeze applications, but a curative amendment under the Planning Code gives them a defined window to fix a defective ordinance.