- Developer
- Nautilus Cryptomine LLC, a joint venture formed in May 2021 by TeraWulf (25 percent) and a Talen Energy subsidiary (75 percent). Talen's Cumulus Coin LLC bought TeraWulf's stake on October 2, 2024 and owned all of Nautilus after that.
- Tenant
- There was no outside tenant. The joint venture mined bitcoin itself. Amazon Web Services, which bought Talen's neighboring Cumulus data center campus in March 2024, took possession of the Nautilus structures in September 2025.
- Current stage
- The facility is closed: in connection with revising its power deal with AWS, Talen agreed in June 2025 to stop using the facility and took the Nautilus assets off its books, and in September 2025 its facility lease with AWS ended and AWS took the existing structures. The site is now part of the AWS campus, which is tracked separately.
- Decision body
- No approvals are pending. The facility sat in Salem Township, Luzerne County, and drew power straight from Talen's Susquehanna plant without a grid connection; any future use of the structures falls under the AWS campus.
- Top issues
- Electricity use and cost: the mine drew up to 200 megawatts of nuclear power directly from Susquehanna at a fixed 2 cents per kilowatt-hour, outside the grid and without the transmission and distribution charges other large users pay. Its closure was tied to Talen's switch to a grid-connected deal to supply Amazon with up to 1,920 megawatts.
- Key opponents
- No organized opposition to the bitcoin mine itself has been reported. Concerns about the larger AWS campus next door are covered in that project's profile.
- Key supporters
- TeraWulf and Talen Energy, which promoted Nautilus as the first bitcoin mine powered entirely by behind-the-meter, zero-carbon nuclear energy. Talen President Alex Hernandez called it a "tangible expression" of Talen's shift toward lower-carbon and digital infrastructure, according to World Nuclear News.
How we got here
TeraWulf and Talen formed Nautilus Cryptomine on May 13, 2021 to build up to 300 megawatts of bitcoin mining beside the Susquehanna nuclear plant, and World Nuclear News reported in August 2021 that the first phase was planned at 180 megawatts, would cost about $350 million to $400 million and was expected online in mid-2022. Mining began in the first quarter of 2023, and by early 2024 Nautilus owned a 200 megawatt facility, with 50 megawatts of operating capacity attributed to TeraWulf at the end of 2023. On February 28, 2024 TeraWulf exercised an option for another 50 megawatts. In March 2024 Talen sold its neighboring Cumulus data center campus to Amazon Web Services, a deal that left Nautilus out. On October 2, 2024 Talen's Cumulus Coin LLC bought out TeraWulf for $85 million in cash plus miners worth about $7 million, and TeraWulf said it was selling ahead of the June 2027 expiration of the 2 cent power contract and ground lease. In June 2025 Talen and Amazon announced an expanded deal for up to 1,920 megawatts from Susquehanna through 2042, and Talen agreed that month to stop using Nautilus. In September 2025 the facility lease ended and AWS took possession of the structures, which Talen reported in its 2025 annual report.