All Pennsylvania projects
Contested

Granville Township Data Center Campus (Lewistown Development LLC)

Granville Township, Mifflin County

Lewistown Development LLC, a subsidiary of Pennsylvania Data Center Partners, wants six two-story data center buildings with about 1.54 million square feet of building area on farmland off Loop Road in Granville Township. The township returned the application as incomplete, and the developer's appeal returns to the Zoning Hearing Board on October 26.

ContestedTBD/UndisclosedGreenfieldN Central
At a glance

The project by the numbers

StatusOn Appeal
Building area1,540,000 sq ft
Site264 acres
Permanent jobs, as claimed150
First announced2026-05-14
Target online2032

Six data center buildings on Mifflin County farmland, rejected as incomplete and now on appeal

The number that mattersThe application was hand-delivered at 3:34 p.m. on Friday, July 10, 2026, two days before the supervisors met in an emergency session on a curative amendment. Six days later the township returned it, writing that a certification required by the zoning ordinance was missing from the traffic study and could not be added after the fact. The developer's appeal says the ordinance requires no such thing at filing, and asks for review under the rules in place that day.
Developer
Lewistown Development LLC (Delaware), a subsidiary of Pennsylvania Data Center Partners (CEO Igal Feibush), which develops in a joint venture with PowerHouse Data Centers; plans by LIVIC Civil
Tenant
Not disclosed. No end user is named in any filing.
Current stage
On appeal. The township manager, acting as zoning officer, returned the conditional use application as incomplete on July 16, 2026, writing that the traffic study lacked a certification the ordinance requires and that it cannot be supplied after the fact. The developer's August 13 appeal to the Zoning Hearing Board disputes that reading and asks that the application be reviewed under the ordinance in effect when it was filed. The developer also challenged the new data center ordinance in the Mifflin County Court of Common Pleas. The board opened its hearing October 1 and continued it so the crowd could hear; the township's notice sets the next session for Monday, October 26 at 6:00 p.m. at the Granville Fire Company Event Center, 105 Malta Drive. The supervisors have also moved their November 9 and December 14 meetings to the event center at 6:00 p.m. because of the crowds.
Decision body
Granville Township Zoning Hearing Board (the appeal of the zoning officer's determination); Board of Supervisors (the conditional use itself, if the application proceeds); Mifflin County Court of Common Pleas (the ordinance challenge)
Top issues
How much water and power the project would need, which none of the posted documents states; a municipal water authority that says it does not know the project's demand; private wells and limestone soils; Standard Steel's concerns about voltage stability and who pays for grid upgrades; noise near homes; the loss of farmland; traffic on Loop Road; an undisclosed end user; and an application filed two days before the supervisors' emergency meeting on a curative amendment
Key opponents
No Data Centers in Mifflin County (NDCMC), represented by environmental attorney Bill Cluck; residents who presented petitions with more than 6,800 signatures; Standard Steel (grid and voltage concerns); County Commissioners Kevin Kodish and Noah Wise, speaking as individuals
Key supporters
None on record. The developer's June 1 presentation projects 150 permanent jobs and about $22.5 million a year in local tax revenue. The Mifflin County Industrial Development Corporation, which owns the industrial park between the two campuses, says it has taken no side and conveyed no easements.

How we got here

April 15, 2026: utility meeting with the municipal authority and project consultants, without the supervisors' knowledge. Mid-May: first public reports; county commissioners call for a public forum; a Change.org petition starts May 17. June 1: about 200 residents attend; the developer's presentation is shown and a petition with 4,274 signatures is presented. June 11: about 300 attend a draft ordinance review. June 22: NDCMC founded. July 10: application filed. July 12: at the emergency meeting, the board chairman and solicitor tell attendees its purpose is moot because the application was filed first; residents ask why the township did not pursue a curative amendment in May. July 15: Ordinance 2026-02 adopted. July 16: application returned as incomplete. July 21: MCIDC says it has taken no side and conveyed no easements. August 13: appeals filed with the Zoning Hearing Board and the Court of Common Pleas. September 17: the board chairman resigns and the board loses its quorum; the court appoints Earl Weaver Jr. on September 23. September 28: Ordinance 2026-03 adopted, replacing 2026-02. October 1: the zoning board opens the appeal hearing and continues it to October 26 at a larger venue. October 11: abc27 reports the supervisors' November 9 and December 14 meetings will be held at 6 p.m. at the event center.

What is at stake

Impacts raised and open questions

Water

High

No posted document states how much water the project would use. The Mifflin County Municipal Authority said in June it did not know the facility's requirements; it has treatment capacity of about 6 million gallons a day and was producing about 2.8 million. Its director offered a hypothetical: "If they come in and say they need 3 million gallons of water a day, we can't do it." Many nearby residents rely on private wells.

Lewistown Sentinel

Energy costs and the grid

High

Standard Steel, whose arc furnace in Burnham depends on stable voltage, told county officials that the county's power infrastructure cannot support a hyperscale load and that Penelec confirmed it will not guarantee the company's incoming voltage if a data center is built. The company says PJM rules could spread grid upgrade costs across utility customers. No posted document states the project's power demand.

Lewistown Sentinel

Visual and light

High

The application covers 264.21 acres of farmland across three parcels; the plan's cover sheet describes a roughly 245-acre development, with no disturbance proposed on a Commercial Highway remnant. Six buildings up to 66 feet tall, with a substation on land zoned Residential Agricultural.

LIVIC Civil for Lewistown Development LLC (posted by Granville Township)

Noise and vibration

Medium

Ordinance 2026-03 limits nighttime noise, 7 p.m. to 7 a.m., to 45 dB(A) and 55 dB(C) at property lines with sensitive receptors, with provisions for places where ambient noise already exceeds the limits. At the August 19 meeting the township engineer estimated about 17 decibels at the nearest pool; residents disputed the estimate and cited low-frequency hum. The developer's appeal asks for review under the earlier ordinance.

Granville Township

Traffic

Medium

The traffic study projects 1,118 vehicle trips a day at full build-out, counting entering and exiting trips, above the township's 750-trip threshold for major traffic impact review, with access from Loop Road and Middle Road.

LIVIC Civil (posted by Granville Township)

Water

Medium

Residents raised sinkholes and limestone soils under the proposed stormwater basins, and a resident asked the township's engineers to study the karst topography. At the August 19 meeting the township engineer said DEP studies show no karst deposits on the site.

Granville Township

Property values

Medium

Property values are a resident concern. At the August 19 meeting a resident who had spoken with an appraiser about Virginia asked what residents should do if their homes lost half their value. No site-specific appraisal or study has been published.

Granville Township
Community response

Who is organizing against it

No Data Centers in Mifflin County (NDCMC)

County (Mifflin) · Founded 2026

Leaders: Co-chairs Nate Fischer and Tisha Schwanger; attorney Bill Cluck

Tactics: Weekly organizing meetings in Lewistown, turnout at township, county and zoning board meetings, legal representation at the Zoning Hearing Board, a protest on the Lewistown square, tabling at community events, a pin fundraiser inspired by a child's drawing, a newsletter, and outreach to state legislators

A grassroots group formed June 22, 2026 to educate, organize and advocate on proposed data center development across Mifflin County. NDCMC wants to connect with organizations across Pennsylvania facing similar developments; reach them through ndcmc.org. Donations go through Venmo (@NDCMC), by check, or in cash at events; the group says it is a registered 501(c)(4), so donations are not tax deductible.

Website · Facebook · Donate

Timeline

How it has unfolded

  • 2026-04-15Utility meeting with the water authority, township staff and the project's consultants; supervisors say they were not told in advance Lewistown Sentinel
  • 2026-05-14First public reports of the proposal; county commissioners urge a public forum CBS21
  • 2026-05-17Change.org petition to protect Granville Township from large-scale data center development launches Change.org
  • 2026-05-21The county planning director says the department has received no application for a Granville data center and that its draft county data center ordinance wouldn't apply in Granville, which has its own zoning. Lewistown Sentinel
  • 2026-05-28County releases a data center planning and guidance document describing water and energy demands Lewistown Sentinel
  • 2026-06-01About 200 attend; the developer's presentation projects 150 jobs and $22.5 million a year in taxes; residents present a petition with 4,274 signatures Lewistown Sentinel
  • 2026-06-11About 300 attend a special meeting reviewing a draft data center ordinance Lewistown Sentinel
  • 2026-06-22NDCMC adopts its founding document and holds its first meeting NDCMC
  • 2026-07-06Petitions reported at 6,840 signatures as residents press supervisors on transparency Lewistown Sentinel
  • 2026-07-10Conditional use application for Granville DC hand-delivered at 3:34 p.m. Lewistown Sentinel
  • 2026-07-12At the emergency meeting on a curative amendment, the board chairman and solicitor tell attendees its purpose is moot because the application was filed first; residents ask why the township did not pursue a curative amendment in May Granville Township
  • 2026-07-15Supervisors adopt Ordinance 2026-02 making data centers a conditional use in the Industrial District with noise, setback and water standards Lewistown Sentinel
  • 2026-07-16Township manager, as zoning officer, returns the application as incomplete and refunds the fee, writing that the traffic study's required certification is missing and cannot be supplied after the fact Granville Township
  • 2026-07-17A July 21 town hall is postponed at the request of the data center representatives abc27
  • 2026-07-21MCIDC says it has granted no easements for the project and has not taken a side Lewistown Sentinel
  • 2026-08-13Developer appeals the rejection to the Zoning Hearing Board, arguing the zoning officer lacked authority and did not act in good faith, and challenges the new ordinance in the Court of Common Pleas abc27
  • 2026-09-17Board chairman William Page resigns after a second supervisor's resignation, leaving the board without a quorum Granville Township
  • 2026-09-23Court appoints Earl Weaver Jr. to the vacant supervisor seat Lewistown Sentinel
  • 2026-09-28Ordinance 2026-03 adopted, replacing 2026-02, with revised noise limits, a public water hookup rule and state permits required before a building permit Granville Township
  • 2026-10-01Appeal hearing opens and is continued to Oct 26 at a larger venue because dozens of attendees outside could not hear; the Sentinel reports the developers withdrew from an Oct 9 court hearing Lewistown Sentinel
  • 2026-10-05Charles W. Watts III appointed to the board and named chairman Granville Township
  • 2026-10-05Township posts notice that the Zoning Hearing Board appeal hearing will be held October 26, 2026 at 6:00 p.m. Granville Township
  • 2026-10-11abc27 reports the supervisors have moved their November meeting to November 9 at 6 p.m. and their December 14 meeting to 6 p.m., both at the Granville Fire Company Event Center, because of crowds drawn by the data center proposal. abc27
Legal record

Filings and legal actions

  • 2026-07-10
    Conditional use application (Major Traffic Impact) Granville Township · Granville DC

    Application for six data center buildings under the township's major traffic impact conditional use. The township manager, acting as zoning officer, returned it because the traffic impact study lacked the preparer's certification under section 4.202(e)(11); her letter says the certification cannot be supplied after the fact. She refunded the fee and invited a new filing. The developer disputes that reading.

    Lewistown Development LLC / Pennsylvania Data Center Partners; Granville Township · Returned as incomplete July 16, 2026
  • 2026-08-13
    Appeal to Zoning Hearing Board Granville Township Zoning Hearing Board · n/a

    Appeal of the zoning officer's rejection, arguing nothing in the ordinance requires the certification at filing, that only the Planning Commission and supervisors could review the application, and that the zoning officer did not act in good faith; asks that review proceed under the ordinance in effect when the application was filed, which the Planning Code protects for duly filed applications.

    Lewistown Development LLC v. Granville Township; NDCMC appearing through counsel · Hearing opened Oct 1, 2026; continued to Oct 26, 2026, 6:00 p.m., Granville Fire Company Event Center (township notice posted Oct 5)
  • 2026-08-13
    Land use appeal (ordinance challenge) Mifflin County Court of Common Pleas · n/a

    Statutory land use appeal challenging the validity of Ordinance 2026-02, the township's data center zoning amendment.

    Lewistown Development LLC v. Granville Township · The Sentinel reports the developers withdrew from an Oct 9, 2026 hearing before Judge Aaron Gingrich; the docket number and the case's current status were not published in the coverage reviewed
News

Coverage of this project

Sources

Know your rights

In Pennsylvania, the local zoning ordinance sets the route. A conditional use is decided by the elected governing body (supervisors, commissioners or council). A special exception or variance, and an appeal of a zoning officer’s decision, go to the Zoning Hearing Board. Each is a public hearing on a record: affected neighbors can ask for party status, cross-examine witnesses, and appeal. Municipalities can also adopt data center ordinances with enforceable standards.

Know your rights →

Take action

Organized community opposition is the single most effective check on these projects in Pennsylvania. Show up to hearings, submit comment when it is taken, support legal and expert-witness costs, and press your municipality for a real ordinance. Pennsylvania municipalities cannot simply freeze applications, but a curative amendment under the Planning Code gives them a defined window to fix a defective ordinance.