York 2 Energy Center Data Center

Peach Bottom Township, York County

An 828 megawatt project proposed for Peach Bottom Township, York County, and the end user has not been named publicly.

ContestedGreenfieldS Central
At a glance

The project by the numbers

StatusProposed
Capacity828 MW
Capex$ 5 B
First announced2025-07-15
Target onlineTBD

Proposed for Peach Bottom Township, York County

The number that mattersThe project is sized at about 828 megawatts.
Tenant
Not disclosed. No end user has been named publicly.
Current stage
Announced July 2025 and still in pre-construction as of early 2026, with no reported groundbreaking.
Decision body
Peach Bottom Township
Top issues
Residents and officials have focused on the size of the electrical load and what it does to regional capacity costs, the conversion of open land or farmland, how little has been disclosed about the end user, water use, continuous mechanical noise, and emissions from backup generation.

Energy Capital Partners / Calpine Corporation. On-site at 828 MW gas turbine plant adjacent to Peach Bottom nuclear (Constellation/PSEG). Bundled with 51 community solar projects (24,000 homes). Tenant TBD. Energy Capital Partners announced a $5 billion data center to be built on the site of its subsidiary Calpine's York 2 Energy Center, an 828 MW dual-fueled combined-cycle gas turbine station in Peach Bottom Township. The project was unveiled July 15, 2025 at the Pennsylvania Energy and Innovation Summit at Carnegie Mellon, part of the more than $90 billion in state investments announced there by Sen. Dave McCormick with President Trump present. The York County Economic Alliance put construction employment at 2,500, and county leaders including President Commissioner Julie Wheeler and YCEA head Kevin Schreiber welcomed it publicly. The developer controls its own on-site generation, so the campus does not depend on new grid supply. The site sits near the Peach Bottom Clean Energy Center, the Constellation and PSEG nuclear station that employs more than 750 people and has sought a license renewal to 2054. As of early 2026 the project remained in pre-construction with no groundbreaking reported.

News

Coverage of this project

Know your rights

In Pennsylvania, a data center on industrial land usually needs a special exception or conditional use, decided by a local Zoning Hearing Board after a public, quasi-judicial hearing. Neighbors can request party status, cross-examine witnesses, and build an evidentiary record. Municipalities can also write data-center ordinances with enforceable standards.