Air quality
MediumBackup diesel generators planned for behind-the-meter resilience.
Shippingport Borough, Beaver County
A 3,600 megawatt campus of roughly 2,000,000 square feet operating or being built at Shippingport Borough, Beaver County.
Frontier Group (660-acre Industrial Park acquired 2022 from Energy Harbor) + Aligned Data Centers (BlackRock GIP / AIP / MGX $40B Aligned acquisition closing H1 2026). 2.7 GW coal-to-gas + 900 MW new simple-cycle = 3.6 GW total; 1.8 GW PPA AI/hyperscale @ 99.9% availability; 1+ GW back to PJM. $3.2B power conversion + $10B DC capex. Gas: 800 MMcf/day from EQT; National Fuel Gas Supply transport. $6B economic activity, $139M annual recurring revenue, $13M state tax, $6M county tax. Conditional use approved by Shippingport Borough late 2025. Aligned 2 (up to 3) buildings ≈2M sq ft.
Backup diesel generators planned for behind-the-meter resilience.
In Pennsylvania, a data center on industrial land usually needs a special exception or conditional use, decided by a local Zoning Hearing Board after a public, quasi-judicial hearing. Neighbors can request party status, cross-examine witnesses, and build an evidentiary record. Municipalities can also write data-center ordinances with enforceable standards.
Know your rights →Organized community opposition is the single most effective check on these projects in Pennsylvania. Show up to hearings, submit comment when it is taken, support legal and expert-witness costs, and ask your municipality for a moratorium and a real ordinance.
How communities push back →