PATER site tracker
Part A candidate

Piney Creek

Clarion County · 336 Power Ln, Clarion, PA 16214

A waste coal plant that retired in 2013 with 36.2 MW of capacity, on a 87.81-acre parcel in Clarion County. The PATER study evaluates it for new large load.

PENELEC zoneEvaluated for new large loadWaste CoalRetired 2013
At a glance

The site by the numbers

Retired capacity36.2 MW
Retired in2013
Parcel87.81 acres
Adjacent land112.74 acres
Within 30 miles186,781 people
From 900 Conshohocken Rd229.0 miles
Section 4.17

What the report says about this site

“Located at 336 Power Ln, Clarion, PA 16214 (coordinates 41°10'40.8"N 79°26'32.0"W), this former coal plant near Williamsburg, PA, retired in 2013 and has a retired capacity of 36.2 MW (see Figure 33 and Table 22). The structures have been largely cleared, and there are no current plans for redevelopment. The 87.8-acre site is located southwest of the intersection of Interstate 80 and State Highway 68. The site is decommissioned, but its remediation status is unknown. It and 112.7 acres of nearby land are not zoned and rated as moderately rugged land. The site is treated as a presumptive brownfield, while soil and groundwater contamination are TBD. FEMA designates the site as having a very low natural hazard risk and minimal flooding risk. The parcel is designated as having possible mine subsidence potential, as it is located within or adjacent to a known coal mining area without confirmed historical mining activities; however, nearby parcels fall within a documented mineable coal area with confirmed underground mining activity and are, therefore, considered to have elevated mine subsidence risk. Rail access is ~2.5 miles away, and major roads are ~1.5 miles away. Major river access is ~12.5 miles away. Transmission lines and a substation are easily accessible on site, and a natural gas pipeline runs ~4 miles away. The nearest broadband installation is ~2 miles away. The nearest generator is ~20.5 miles away. The site sits on the Marcellus shale formation. The nearest wastewater treatment plant is ~2.5 miles away, but the nearest brownfield is ~19 miles away. There are ~186,781 people within 30 miles of the site.”

PATER Part A report, section 4.17, page 51
Table 22

Site attributes

Report name
Piney Creek
Address
336 Power Ln, Clarion, PA 16214
Coordinates
41°10'40.8"N 79°26'32.0"W
Fuel
Waste Coal
Zoning
Special
Ruggedness
4 = Moderately rugged
Brownfield designation
Presumptive
On-site contamination
TBD
Groundwater contamination
TBD
FEMA natural hazards risk
Very low
FEMA flood hazard
Minimal
Population within 30 miles
About 186,781 (report estimate)
PJM transmission zone
PENELEC
Evaluated for
New large load
Table 22

Distance to infrastructure

Approximate distance in miles, as published in Table 22 (page 51). The report says distances are measured from a point on the site and “all distance measurements must be considered general.”
Distance toMiles
Major road1.05
Rail network2.48
Major river12.41
Transmission line0.00
Substation0.00
Natural gas pipeline3.97
Broadband1.71
Marcellus Shale formation0.00
Wastewater treatment facility2.51
Brownfield site18.76
Screening category

What the report evaluated this site for

The report places sites in the PENELEC transmission zone in its large-load category, because expected generation additions there exceed projected load growth (pages 76 and 79).

The acreage-based generation estimates in Table 28 cover only the sites in zones evaluated for generation, so this site does not appear there.

Status

Where this site stands

Current status
Part A candidate. Part B will narrow the 21 sites to 5 to 7 priorities.
Next step
Part B will rank the sites and validate the top 5 to 7 through site visits (page 103).
Public comment
Written comments on Part A are accepted under PUC Docket No. M-2026-3059601 through October 14, 2026.
Review meetings
The report says PATER Study Review Meetings are planned for October and February (page 103).

Our view on the study

Pennsylvania is studying two Schuylkill power sites. We think residents deserve corrected data, real environmental analysis and a straight answer on costs before the list gets shorter.

Read our view →

Take action

File a comment by October 14, watch the October 7 review meeting, and come to the Zoning Hearing Board on Thursday, October 15 at 7:00 p.m.

Ways to help →