A fuel oil peaker plant that retired in 1984 with 46 MW of capacity, on a 9.66-acre parcel in Centre County. The PATER study evaluates it for new generation or large load.
The site by the numbers
What the report says about this site
“Located at 285 Commercial St, Milesburg, PA 16853 (coordinates 40°56'26.4"N 77°47'21.4"W), this former fuel oil peaker plant retired in 1984 and has a retired capacity of 46 MW (see Figure 30 and Table 19). The land is cleared and has no plans for redevelopment currently. The 9.7-acre site is located near the intersection of Interstate 80 and Interstate 99. The site has been decommissioned, but its remediation status is unknown. It and 15.3 acres of adjacent available land is zoned for industrial use and rated as level ground. The site is not classified as a presumptive brownfield, but it has been confirmed to have soil contamination while groundwater contamination has not been determined. FEMA designates the site as having a relatively low natural hazard risk but sitting in a floodway. The parcel and nearby parcels are not located within or adjacent to a documented coal mining area and are, therefore, considered to have minimal mine subsidence potential. Rail access and major roads are easily accessible at the site, but the nearest major river access is ~18.5 miles away. The site has easily accessible transmission lines and a substation, but the nearest natural gas pipeline is ~1.5 miles away. The nearest broadband installation is 9.5 miles away. The nearest generator is ~27 miles away. The site is ~1 mile from the Marcellus shale formation. The nearest wastewater treatment plant is ~1 mile away, and the nearest brownfield is ~5 miles away. There are ~267,976 people within 30 miles of the site.”
PATER Part A report, section 4.14, page 48
Site attributes
- Report name
- Milesburg
- Address
- 285 Commercial St, Milesburg, PA 16853
- Coordinates
- 40°56'26.4"N 77°47'21.4"W
- Fuel
- Distillate Fuel Oil
- Zoning
- Industrial
- Ruggedness
- 0 = Level
- Brownfield designation
- Not Presumptive
- On-site contamination
- Confirmed
- Groundwater contamination
- TBD
- FEMA natural hazards risk
- Relatively low
- FEMA flood hazard
- Floodway
- Population within 30 miles
- About 267,976 (report estimate)
- PJM transmission zone
- APS
- Evaluated for
- New generation or large load
Distance to infrastructure
| Distance to | Miles |
|---|---|
| Major road | 0.02 |
| Rail network | 0.18 |
| Major river | 18.69 |
| Transmission line | 0.00 |
| Substation | 0.01 |
| Natural gas pipeline | 1.31 |
| Broadband | 9.51 |
| Marcellus Shale formation | 0.94 |
| Wastewater treatment facility | 1.20 |
| Brownfield site | 4.87 |
The report’s acreage-based capacity estimates
| Technology | Parcel (10 acres) | Extended (25 acres) |
|---|---|---|
| Natural gas | 48 | 125 |
| Conventional nuclear | 16 | 42 |
| Battery storage | 138 | 356 |
| Solar | 1 | 4 |
The report evaluated sites in the APS transmission zone for both new generation and new large loads, because the difference between expected load and generation there was marginal (page 79).
Where this site stands
- Current status
- Part A candidate. Part B will narrow the 21 sites to 5 to 7 priorities.
- Next step
- Part B will rank the sites and validate the top 5 to 7 through site visits (page 103).
- Public comment
- Written comments on Part A are accepted under PUC Docket No. M-2026-3059601 through October 14, 2026.
- Review meetings
- The report says PATER Study Review Meetings are planned for October and February (page 103).
All 21 candidate sites
- Barbadoes Island2.7 mi
- Venice Island (JSC)5.7 mi
- Cromby12.1 mi
- Martins Creek Harwood69.5 mi
- West Shore86.3 mi
- Jenkins86.6 mi
- Stanton92.5 mi
- Lock Haven133.6 mi
- Milesburg142.6 mi
- Williamsburg154.6 mi
- Cambria Cogeneration180.4 mi
- Armstrong Power Station225.6 mi
- Piney Creek229.0 mi
- Elrama Power Plant243.1 mi
- Hatfield's Ferry244.6 mi
- Mitchell Power Station245.8 mi
- F R Phillips260.8 mi
- Wayne264.5 mi
- AES Beaver Valley268.1 mi
- North East Cogeneration277.1 mi
- Erie Mill284.4 mi
Our view on the study
Pennsylvania is studying two Schuylkill power sites. We think residents deserve corrected data, real environmental analysis and a straight answer on costs before the list gets shorter.
Read our view →Take action
File a comment by October 14, watch the October 7 review meeting, and come to the Zoning Hearing Board on Thursday, October 15 at 7:00 p.m.
Ways to help →