Lock Haven
Clinton County · No street address in the report
A fuel oil peaker plant that retired in 2022 with 18.5 MW of capacity, on a 33.97-acre parcel in Clinton County. The PATER study evaluates it for new generation.
The site by the numbers
What the report says about this site
“Located at no specific address but at coordinates 41°07'08.0"N 77°28'15.7"W, this former fuel oil peaker plant located across Balk Eagle Creek from Flemington PA retired in 2022 and has a retired capacity of 18.5 MW (see Figure 28 and Table 17). Pennsylvania Power and Light Co. has plans to rebuild the lock haven substation and Sunbury–Lock Haven 69-kV line here. The 34-acre site is located between Flemington and Mill Hall. The site is decommissioned, but its remediation status is unknown. It is zoned for commercial use and rated as nearly level. The site is not classified as a presumptive brownfield, and there is no known soil or groundwater contamination. FEMA designates the site as having a relatively low natural hazard risk but sitting in a floodway. The parcel and nearby parcels are not located within or adjacent to a documented coal mining area and are, therefore, considered to have minimal mine subsidence potential. The site has easy major road and rail access, and river access is ~2.5 miles away. The site has immediate access to transmission lines and a substation, but a natural gas pipeline is ~11 miles away. The nearest broadband installation is ~20 miles away. The nearest generator is ~33 miles away. The site sits ~1 mile from the Marcellus shale formation. The nearest wastewater treatment plant and brownfield are ~2 miles away. There are ~239,464 people within 30 miles of the site.”
PATER Part A report, section 4.12, page 46
Site attributes
- Report name
- Lock Haven (PENNPOW)
- Address
- No street address in the report
- Coordinates
- 41°07'08.0"N 77°28'15.7"W
- Fuel
- Distillate Fuel Oil
- Zoning
- Commercial
- Ruggedness
- 1 = Nearly level
- Brownfield designation
- Not Presumptive
- On-site contamination
- None known
- Groundwater contamination
- None known
- FEMA natural hazards risk
- Relatively low
- FEMA flood hazard
- Floodway
- Population within 30 miles
- About 239,464 (report estimate)
- PJM transmission zone
- PPL
- Evaluated for
- New generation
Distance to infrastructure
| Distance to | Miles |
|---|---|
| Major road | 0.25 |
| Rail network | 0.23 |
| Major river | 2.42 |
| Transmission line | 0.00 |
| Substation | 0.00 |
| Natural gas pipeline | 11.34 |
| Broadband | 20.32 |
| Marcellus Shale formation | 0.88 |
| Wastewater treatment facility | 2.22 |
| Brownfield site | 2.12 |
The report’s acreage-based capacity estimates
| Technology | Parcel (34 acres) | Extended (34 acres) |
|---|---|---|
| Natural gas | 170 | 170 |
| Conventional nuclear | 57 | 57 |
| Battery storage | 485 | 485 |
| Solar | 5 | 5 |
The report places sites in the PPL transmission zone in its generation category, because projected load growth there exceeds expected generation additions (pages 76 and 77).
Where this site stands
- Current status
- Part A candidate. Part B will narrow the 21 sites to 5 to 7 priorities.
- Next step
- Part B will rank the sites and validate the top 5 to 7 through site visits (page 103).
- Public comment
- Written comments on Part A are accepted under PUC Docket No. M-2026-3059601 through October 14, 2026.
- Review meetings
- The report says PATER Study Review Meetings are planned for October and February (page 103).
All 21 candidate sites
- Barbadoes Island2.7 mi
- Venice Island (JSC)5.7 mi
- Cromby12.1 mi
- Martins Creek Harwood69.5 mi
- West Shore86.3 mi
- Jenkins86.6 mi
- Stanton92.5 mi
- Lock Haven133.6 mi
- Milesburg142.6 mi
- Williamsburg154.6 mi
- Cambria Cogeneration180.4 mi
- Armstrong Power Station225.6 mi
- Piney Creek229.0 mi
- Elrama Power Plant243.1 mi
- Hatfield's Ferry244.6 mi
- Mitchell Power Station245.8 mi
- F R Phillips260.8 mi
- Wayne264.5 mi
- AES Beaver Valley268.1 mi
- North East Cogeneration277.1 mi
- Erie Mill284.4 mi
Our view on the study
Pennsylvania is studying two Schuylkill power sites. We think residents deserve corrected data, real environmental analysis and a straight answer on costs before the list gets shorter.
Read our view →Take action
File a comment by October 14, watch the October 7 review meeting, and come to the Zoning Hearing Board on Thursday, October 15 at 7:00 p.m.