Cambria County · 243 Rubisch Rd, Ebensburg, PA 15931

A waste coal plant that retired in 2019 with 98 MW of capacity, on a 46.33-acre parcel in Cambria County. The PATER study evaluates it for new large load.

PENELEC zoneEvaluated for new large loadWaste CoalRetired 2019
At a glance

The site by the numbers

Retired capacity98 MW
Retired in2019
Parcel46.33 acres
Adjacent land55.59 acres
Within 30 miles389,131 people
From 900 Conshohocken Rd180.4 miles
Section 4.4

What the report says about this site

“Located at 243 Rubisch Rd, Ebensburg, PA 15931 (coordinates 40°28'28.2"N 78°42'04.7"W), this 46.3-acre former coal plant retired in 2019 and has a retired capacity of 98 MW (see Figure 20 and Table 9). Most of the buildings have been demolished, and a waste management company has built a parking lot and started operating on the site. The site has been decommissioned, but the remediation status is unknown. The site is south of US-22 and just north of Bethlehem Mine 33. It is zoned for industrial use and has 55.6 acres of potentially developable adjacent land rated as moderately rugged. The site is considered a presumptive brownfield and there is no known groundwater contamination. FEMA designates the site as having a relatively low natural hazard risk and as a minimal flooding risk. The parcel and nearby parcels are located within or adjacent to a confirmed underground mining area and are, therefore, considered to have elevated mine subsidence potential. The site has immediate access to major highways, and rail access is ~1 mile away; however, the closest major river is ~10 miles away. The site has close access to transmission lines, a substation, and a natural gas pipeline, and the nearest installed broadband is ~1 mile away. The nearest generating station is ~7 miles away. The site is located on the Marcellus shale formation. The nearest wastewater treatment plant is ~1 mile away, and the nearest brownfield is ~2 miles away. There are ~389,131 people within 30 miles of the site.”

PATER Part A report, section 4.4, page 38
Table 9

Site attributes

Report name
Cambria Cogeneration
Address
243 Rubisch Rd, Ebensburg, PA 15931
Coordinates
40°28'28.2"N 78°42'04.7"W
Fuel
Waste Coal
Zoning
Industrial
Ruggedness
4 = Moderately rugged
Brownfield designation
Presumptive
On-site contamination
TBD
Groundwater contamination
None Known
FEMA natural hazards risk
Relatively low
FEMA flood hazard
Minimal
Population within 30 miles
About 389,131 (report estimate)
PJM transmission zone
PENELEC
Evaluated for
New large load
Table 9

Distance to infrastructure

Approximate distance in miles, as published in Table 9 (page 38). The report says distances are measured from a point on the site and “all distance measurements must be considered general.”
Distance toMiles
Major road0.27
Rail network1.03
Major river9.47
Transmission line0.00
Substation0.07
Natural gas pipeline0.13
Broadband1.25
Marcellus Shale formation0.00
Wastewater treatment facility1.01
Brownfield site2.20
Screening category

What the report evaluated this site for

The report places sites in the PENELEC transmission zone in its large-load category, because expected generation additions there exceed projected load growth (pages 76 and 79).

The acreage-based generation estimates in Table 28 cover only the sites in zones evaluated for generation, so this site does not appear there.

Status

Where this site stands

Current status
Part A candidate. Part B will narrow the 21 sites to 5 to 7 priorities.
Next step
Part B will rank the sites and validate the top 5 to 7 through site visits (page 103).
Public comment
Written comments on Part A are accepted under PUC Docket No. M-2026-3059601 through October 14, 2026.
Review meetings
The report says PATER Study Review Meetings are planned for October and February (page 103).

Our view on the study

Pennsylvania is studying two Schuylkill power sites. We think residents deserve corrected data, real environmental analysis and a straight answer on costs before the list gets shorter.

Read our view →

Take action

File a comment by October 14, watch the October 7 review meeting, and come to the Zoning Hearing Board on Thursday, October 15 at 7:00 p.m.

Ways to help →